Wednesday, 16 May 2012

Day 11 - Eamonn Kelly



Today we split into two groups, the first group (Will, George, David and myself) got the 7am bus up to the school.  We spent the morning digging holes and positioning the second curve of the tyre run along with arranging balance beams while the second group stayed back and collected materials and tools.  As the school had a half-day we had an early lunch after which the second group arrived at site.

The afternoon was spent constructing temporary workbenches before starting on the assembly of the football goals. Being our first structural element to be erected it took longer than anticipated, however we managed to successfully concrete in the first goal post before the rain came.  We used cement for these constructions but still hope to source local lime for future foundations.