| Tyre swing has finally been erected |
APE Projects seek to fundraise, design and hand build Adventure Playgrounds for Education for various communities throughout the world. Where possible, we engage with the children to deliver a playground that provides a true sense of ownership. We seek to create beautiful spaces to enable physical, social, sensorial, creative and contemplative play, using locally sourced materials with minimal ecological impact.
Panorama of site
Sunday, 27 May 2012
Day 19 - Eamonn Kelly
Wow what a great day, after a failed attempt yesterday the monster of a tyre swing has been erected. The morning was spent widening the holes significantly to accommodate the supporting legs. Although we came across a pipe in one of the holes it did not stop proceedings as I was determined to get the tyre swing in the ground today. After lunch all 9 of us got involved in positioning the frame with the assistance of the farmer and his tractor. In order to get the correct angle to bolt the legs on, we needed to raise the frame over 2m keeping it horizontal. Once the legs were attached the frame was lowered into position. It was a great feeling to see it positioned and ready for concrete. As time was running late we only managed to concrete one of the holes. At the same time Lindsay and Jesse had prepared the abacus ready for concrete and so the first part of the Interactive wall was put in place. Successful day rewarded with a nice cold Belikin beer after work!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment